Saturday 11 May 2024
Last Modified: Wednesday, 27 March 2024.

Select your language

The basic framework for my model railway is in place. All rails and switches are wired and working as planned. However, during test operation I noticed that a through track in the shadow station is not enough. I therefore built a second through track(Picture). Now even a long freight train can be parked in the shadow track without hindering other trains. I started building the platform for tracks 2 and 3. This is now being gradually completed. I'm currently creating a Reel every day for my new Instagram account https://www.instagram.com/matzes.schienen/  The plan is to create a monthly construction documentation/driving video for mine from these videos Youtube canal. to create.